Shipping
Courier and collection notes follow the machine move you book. Crown Mines loading arrangements apply on warehouse collections.
How collections and delivery are handled
Once an order is confirmed, the move is planned around the machine, the access route and the people needed on site. Collection from a warehouse or yard is only arranged once the loading point, the lifting method and the handover details are clear. For machines moving from our Crown Mines floor, the same applies: we first confirm what is being moved, what needs to be stripped or secured, and how it will be loaded safely.
Courier and collection notes follow the machine move you book. If the order includes spares or tooling, these are packed to suit the item and the route, so they are not damaged in transit or lost during transfer. If you need more detail on how a machine will be prepared before it leaves, use the contact form and include the machine name, location and what you need moved with it.
What the buyer should prepare on site
Delivery is only one part of the move. The receiving site must be ready before the machine arrives. That means a clear unloading path, enough space to position the machine, and a floor that is suitable for the weight and footprint of the equipment. Heavy machines need proper rigging and careful placement, and the final position should allow for access to the controls, service points and operator area.
For used machines, buyers should also check the practical details before the move is finalised. That includes the power supply on site, the condition of the foundation or slab, and whether any existing equipment has to be moved first. If a machine will be installed with manuals or support documents, make sure these are requested early so they can be included with the shipment or collection plan.
- Make sure the route from vehicle to final position is clear.
- Confirm that lifting gear and rigging access are suitable.
- Check that electrical preparation is complete before the machine arrives.
Commissioning, handover and follow-up
Where commissioning is part of the order, it is scheduled after delivery and once the machine is in place. This is the stage where the machine is checked in working position, basic settings are confirmed, and the buyer is shown the points that matter for daily use. If operator guidance is needed, it is handled as part of the handover, not as an extra promise after the fact.
Some machines need attention after they have settled on site, especially if they have been moved over a long distance or installed on a prepared floor. If you are arranging a move together with inspection or support, include that in the enquiry so the work can be planned properly. The same applies when the machine is going to one of our showroom bays, such as shops or the other placements listed on the site. Use the contact form for all shipping and follow-up enquiries.