Scale up planning starts with the work that no longer fits your available spindle time, swing, travel or table capacity. The figures from those delayed jobs set the size of the next machine.

Capacity gap details
Delayed component families define the first figures, including largest diameter, length, bore depth and mass.
Another lathe suits repeat turning only after chuck size, spindle bore, centre distance and tooling changeovers are clear.
Larger boring work needs table load, travel, spindle taper, facing work and fixture height recorded in writing.
Machine fit checks
Machine fit is not the same as machine size, because floor access and connected tooling can block a workable purchase.
Listed limits separate a capacity problem from a tooling problem during machine selection.
A scale-up brief needs four written checks before head office can narrow the machine range:
- Present machine list with swing, centres, spindle bore, travel and table size.
- Part sizes that no longer fit within your safe setup limits.
- Required tooling carry-over, including chucks, steadies, boring bars and clamps.
- Workshop limits for floor space, doorway clearance, lifting access and three-phase supply.
Buying order checks
Recurring part sizes, repeat setups and profitable repair work already on your order book should guide the next machine.
Capacity added around one unusual job can tie up floor space without improving the work queue.
Tooling, spares and holding equipment are discussed with the machine type, not after it.